COLORADO ELECTRONICS INC — Department of Defense SBIR Phase II: SB171-010
COLORADO ELECTRONICS INC — SBIR Phase II award from Department of Defense.
- Amount
- $1,498,524
- Agency
- Department of Defense · Defense Advanced Research Projects Agency
- Program / Phase
- SBIR · Phase II
- Topic
- SB171-010
- Solicitation
- 17.1
- NAICS
- —
- Place of performance
- CO
- Period
- 2019-03-05 → 2020-03-04
Description
The proposal discusses the possible implementation of the high power density high voltage unit that can satisfy technical requirements of the unit defined in the DARPA SBIR Topic# SB171-010 (Ultra-Compact Power Conditioning System for High Power RF Transmitters). Paper summarizes the results of the work that was performed by CPE during Phase I in 2017. The electrical design of all critical power subsystems has been completed and conceptual mechanical design has been completed too. The Phase I results demonstrate feasibility of implementation of the unit in the required form factor. The scope of work that is necessary to bring TRL of the proposed unit to 6 and then to 7 is outlined for SBIR Phase II project along with the project cost and preliminary schedule.