Tyvak Nano-Satellite Systems, Inc. — National Aeronautics and Space Administration SBIR Phase I: Z9

Tyvak Nano-Satellite Systems, Inc. — SBIR Phase I award from National Aeronautics and Space Administration.

Amount
$124,386
Agency
National Aeronautics and Space Administration
Program / Phase
SBIR · Phase I
Topic
Z9
Solicitation
SBIR_18_P1
NAICS
Place of performance
CA
Period
2018-07-27 → 2019-02-15

Description

<p>The Tyvak Extended Mission PlatfOrm (TEMPO)&nbsp;leverages ongoing component development and existing Tyvak hardware and software to produce a low-cost, high-performing avionics system for small launch vehicles and maneuvering upper stage carrier vehicles. The system provides autonomous guidance and control and stage/deployment sequencing. It also uses customizable subsystem packages to enable carrier vehicles to provide services currently unavailable to small satellites, such as delivery of multiple satellites to multiple orbital planes, long-duration carrier vehicle operations, delayed deployment of spare satellites until they are needed to replenish a constellation, hub-and-spoke rendezvous and proximity, and communication relay. Consolidating these capabilities into the carrier vehicle allows for simpler satellite designs with more of the size, weight, and power devoted to the payload. For launch vehicles requiring an autonomous flight safety system, Tyvak will assess simultaneous processing of safety-critical and non-safety critical algorithms using a real-time operating system running on a single dual-core or multi-chip processor. This could reduce size and weight, or increase redundancy without weight penalty. Tyvak will also evaluate a flexible modular design configurable for single-string or redundant architectures. Compared with existing launch and carrier vehicle avionics, TEMPO drastically reduces cost, size, weight, and power by leveraging Tyvak&rsquo;s small satellite and launch vehicle avionics technologies, such as the advanced lightweight GPS metric tracking unit Tyvak is developing under a NASA Tipping Point contract. This technology is scheduled to undergo&nbsp;three sounding rocket certification flights within the year. TEMPO<strong>&nbsp;</strong>effort will culminate in a system-level PDR that will define the system architecture. Successful completion of the PDR will pave the way for a follow-on effort to take the system to TRL 5-6, and eventual flight demonstration.</p>