GOLETA STAR, LLC — Department of Defense SBIR Phase II: A152-093

GOLETA STAR, LLC — SBIR Phase II award from Department of Defense.

Amount
$999,981
Agency
Department of Defense · Army
Program / Phase
SBIR · Phase II
Topic
A152-093
Solicitation
2015.2
NAICS
Place of performance
CA
Period
2017-04-11 → 2019-04-10

Description

High-voltage power lines present hazardous operating conditions for the helicopters especially when the pilot vision is degraded by obscurants such as dust, smoke, fog, rain, and snow. The power lines are subtle objects for the pilot in the cockpit to see, not to mention when visibility gets bad such as in the case of operating at night and poor weather condition. Thus, power-line-strike accident has been a major threat for helicopter safety. On Phase 2 the Goleta Star team will use advanced processing techniques to continue to develop wire detection algorithms. The team brings together complimentary skills from over twenty years investigating W-band radar for wire and obstacle detection for safe flight and landing for helicopters and fixed wing aircraft. We will mature approaches developed in Phase 1 to recognizing wires, including wires from 3/8 up to bundled high power transmission lines, from angles of incidence of 0-degrees (head-on from the sensor) to 45-degrees angle of incidence from the sensor. The techniques developed will be developed utilizing the previously collected fully calibrated government furnished sensor data at W-band. We will then develop Phase 3 plans to fully mature the algorithm(s) and transition to candidate Army assets, and possible commercial utility.