EUCLID TECHLABS, LLC — Department of Energy SBIR Phase I: Multipactor discharges in dielectric accelerating structures are a major limitation on the
EUCLID TECHLABS, LLC — SBIR Phase I award from Department of Energy.
- Amount
- $149,979
- Agency
- Department of Energy
- Program / Phase
- SBIR · Phase I
- Solicitation
- DE-FOA-0000577
- NAICS
- —
- Place of performance
- OH
- Period
- 2012-02-20 → 2012-11-19
Description
Multipactor discharges in dielectric accelerating structures are a major limitation on the performance of this otherwise very promising technology for future high energy physics machines and other applications. We will experimentally study a new approach, using a proper external solenoid field, to completely suppress multipactor. This approach has been theoretically studied and verified in a 3-D numerical simulation. The overall objective for the proposed Phase I program is the evaluation, design, and fabrication of DLA test structures for the high power multipactor experiments to be performed. Three X-band dielectric test structures (consisting of materials with different electronic properties) will be built, instrumented, and cold tested preparatory to high power measurements in Phase II. Applications and benefits: Eliminating multipactor effects in dielectric accelerators will allow higher power and higher efficiency operation of these machines. This will represent a great leap forward for the applications of dielectric materials in various particle accelerators and high power rf generation applications.