SAN DIEGO COMPOSITES, INC. — Department of Defense SBIR Phase II: In Phase I, SDC demonstrated feasibility of lightweight and low cost technologies for cont

SAN DIEGO COMPOSITES, INC. — SBIR Phase II award from Department of Defense.

Amount
$991,398
Agency
Department of Defense · Army
Program / Phase
SBIR · Phase II
Solicitation
2011.2
NAICS
Place of performance
CA
Period
2013-03-19 → 2015-03-21

Description

In Phase I, SDC demonstrated feasibility of lightweight and low cost technologies for containerizing and vertically launching multiple missiles simultaneously for the EAPS system. The next step, in Phase II, is to continue the component and design trade studies to develop the lightest and most cost effective canister system possible for EAPS, manufacture full scale EAPS canister assemblies, qualify the canisters with relevant environment testing, and provide full scale EAPS canister assemblies to the EAPS prime contractors for qualification testing and final system validation. The overall goal of this SBIR program is to enter into a Phase III effort with the EAPS prime contractor to produce lightweight and low cost canisters that meet all EAPS requirements in order to benefit the Army and the warfighter. This SBIR program has a unique opportunity in which the small business, SDC, is fully capable, based on experience and legacy, of developing and producing production canisters for an existing platform, the potential missile program prime contractors are engaged, and the missile development and canister development schedules are aligned. The Phase II effort is a vital step required to bridge the gap between the feasibility shown in Phase I and Phase III platform integration.