MAINSTREAM ENGINEERING CORP — Department of Defense SBIR Phase II: Current methods of supplying ice to the soldier are limited to using small commercial ice

MAINSTREAM ENGINEERING CORP — SBIR Phase II award from Department of Defense.

Amount
$389,855
Agency
Department of Defense · Army
Program / Phase
SBIR · Phase II
Solicitation
2010.3
NAICS
Place of performance
FL
Period
2012-03-01

Description

Current methods of supplying ice to the soldier are limited to using small commercial ice makers in field kitchens (for very limited quantities of ice) and manufacturing ice at remote factory locations by trucking this ice to forward operating bases. In Phase I, Mainstream designed, fabricated, and tested a field-deployable ice making system that operates on military tactical generators. Compared to the current Army ice making solution, equipping military bases with Mainstream"s ice maker can save $363,000,000 over 15 years. The return on investment time is 10 months for an optimized Phase II solution. In Phase II, Mainstream will finalize the design and deliver a second-generation system at the end of the first year. Following field tests, life tests, and Army evaluations, Mainstream will fabricate the third-generation, production-version system, which will be available to the military at the end of the second year.