3TEX, Inc. — Department of Energy SBIR Phase II: 20 a

3TEX, Inc. — SBIR Phase II award from Department of Energy.

Amount
$999,370
Agency
Department of Energy
Program / Phase
SBIR · Phase II
Topic
20 a
Solicitation
DE-FOA-0000350
NAICS
Place of performance
NC
Period
— → 2012-08-14

Description

Wind blades are complex constructions of composite materials. As with all composite structures, forming joints between the various elements has long been problematic, since composites cannot easily be bolted, fastened, or welded together. Current manufacturing methods result in thick adhesive layers that have varying dimensions and which are the most common failure area in wind blades during operation in the field. Integral Pi shaped (shaped like the Greek letter p) and