Scalable Wide-Field-of-View Electro-Optical Payloads for GEO Space Domain Awareness
SBIR topic from SpaceWERX, solicitation 26.BX. Closes 2026-06-24.
- Component (WERX)
- SpaceWERX
- Agency
- USAF
- Program / Phase
- SBIR
- Solicitation #
- 26.BX
- Topic #
- DAF26BX02-NV500
- Status
- Closed
- Pre-release date
- 2026-05-06
- Open date
- 2026-05-27
- Close date
- 2026-06-24 · Add to calendar · See all deadlines
- Set-aside
- —
- NAICS
- —
Topic brief
AFWERX / SpaceWERX-style open topics reward clear dual-use technology and a crisp problem framing. Treat DAF26BX02-NV500 as a customer-problem essay tied to Air Force / Space Force mission pull — not a generic SBIR dump.
Who this is for
- Dual-use tech firms targeting Air Force or Space Force end users
- Teams that can show commercial traction or dual-use path
- Companies following the monthly DSIP / WERX open-topic cadence
Capture playbook
- Frame the warfighter / operator problem in one paragraph before tech
- Show dual-use or commercial path alongside defense application
- Check peer AFWERX open topics closing the same cycle
- Use the monthly open-topic digest to avoid missing the drop
- Run match + scorecard before allocating proposal bandwidth
pWin cues
- Specific end-user pain and measurable outcome
- Technology maturity appropriate to the phase
- Evidence of speed — AFWERX culture rewards execution
Watch-outs
- Generic dual-use claims without a named mission thread
- Missing the monthly cycle because you only checked SBIR.gov weekly
- Ignoring related open topics that dilute or concentrate competition
Peer open topics
Topic brief FAQ
Where are AFWERX open topics listed?
Live lists are on /afwerx-open-topics and the opportunities feed; monthly digests summarize the open cycle.
How does the monthly DSIP drop work?
DoD SBIR/STTR topics often release on a monthly cadence via DSIP. See the AFWERX DSIP guide on the blog.
Is open topic the same as a traditional SBIR topic?
Open topics are broader problem statements; traditional topics are often more narrowly specified. Read evaluation criteria carefully.
Readiness scorecard Capability match Monthly open-topic digest All topic briefs
Go / No-Go decision pack
One-click pack: competitive field, conversion signal, related awards, and (Pro) a full GO / MAYBE / NO-GO verdict against your capability.
Open scorecard Match my capability
Pro unlocks full Go/No-Go verdicts and named incumbents. Compare plans
Incumbent detector
No adjacent award history found for this topic yet. Use the decision pack and scorecard to build your own go/no-go case, and re-check after the next data refresh.
Description
The objective of this Phase I effort is to conduct a feasibility study of a commercially derived, Wide-Field-of-View (WFOV) Electro-Optical (EO) payload concept to support persistent Space Domain Awareness (SDA) in the geostationary (GEO) belt. Existing SDA capabilities, such as the joint National Reconnaissance Office (NRO) — United States Space Force (USSF) SILENTBARKER mission, provide a reference point for current approaches to GEO object detection, custody, and indications and warning. This topic seeks to explore commercially derived WFOV EO payload concepts that could inform future enhancements to space-based SDA capabilities beyond the current state of the art. Phase I will evaluate candidate payload architectures and mature Concepts of Operations (CONOPS) for autonomous wide-area GEO search, dynamic tasked collections on priority Resident Space Objects (RSOs), and generation of timely tip-and-cue data suitable for integration with complementary SDA and reconnaissance systems. The feasibility study will assess performance, scalability, and integration considerations associated with commercially derived imaging technologies, with the goal of identifying viable approaches that align with anticipated Space Force SDA mission needs. The outcome of Phase I will be a documented feasibility assessment and a clearly defined roadmap for Phase II prototype development, including recommended payload architectures, key technical risks, and operational considerations.
Score this topic against your capability statement
Loading teaming suggestions…
Post a teaming need for this topic. Team+ posts go live immediately; free/Pro posts are moderated.
Pro+: starter abstract / approach / work plan / risks — outline only, not a full proposal.
Pro+: paste solicitation text or upload PDF/DOCX to extract SHALL/must requirements.
Turn this topic into a compliance checklist, evaluation criteria, and win themes.