Project Celestial: Multi-Domain Site Selection Framework for Terrestrial and Maritime Spaceport Infrastructure
SBIR topic from SpaceWERX, solicitation 26.BX. Closes 2026-06-24.
- Component (WERX)
- SpaceWERX
- Agency
- USAF
- Program / Phase
- SBIR
- Solicitation #
- 26.BX
- Topic #
- DAF26BX02-NV503
- Status
- Closed
- Pre-release date
- 2026-05-06
- Open date
- 2026-05-27
- Close date
- 2026-06-24 · Add to calendar · See all deadlines
- Set-aside
- —
- NAICS
- —
Topic brief
AFWERX / SpaceWERX-style open topics reward clear dual-use technology and a crisp problem framing. Treat DAF26BX02-NV503 as a customer-problem essay tied to Air Force / Space Force mission pull — not a generic SBIR dump.
Who this is for
- Dual-use tech firms targeting Air Force or Space Force end users
- Teams that can show commercial traction or dual-use path
- Companies following the monthly DSIP / WERX open-topic cadence
Capture playbook
- Frame the warfighter / operator problem in one paragraph before tech
- Show dual-use or commercial path alongside defense application
- Check peer AFWERX open topics closing the same cycle
- Use the monthly open-topic digest to avoid missing the drop
- Run match + scorecard before allocating proposal bandwidth
pWin cues
- Specific end-user pain and measurable outcome
- Technology maturity appropriate to the phase
- Evidence of speed — AFWERX culture rewards execution
Watch-outs
- Generic dual-use claims without a named mission thread
- Missing the monthly cycle because you only checked SBIR.gov weekly
- Ignoring related open topics that dilute or concentrate competition
Peer open topics
Topic brief FAQ
Where are AFWERX open topics listed?
Live lists are on /afwerx-open-topics and the opportunities feed; monthly digests summarize the open cycle.
How does the monthly DSIP drop work?
DoD SBIR/STTR topics often release on a monthly cadence via DSIP. See the AFWERX DSIP guide on the blog.
Is open topic the same as a traditional SBIR topic?
Open topics are broader problem statements; traditional topics are often more narrowly specified. Read evaluation criteria carefully.
Readiness scorecard Capability match Monthly open-topic digest All topic briefs
Go / No-Go decision pack
One-click pack: competitive field, conversion signal, related awards, and (Pro) a full GO / MAYBE / NO-GO verdict against your capability.
Open scorecard Match my capability
Pro unlocks full Go/No-Go verdicts and named incumbents. Compare plans
Incumbent detector
No adjacent award history found for this topic yet. Use the decision pack and scorecard to build your own go/no-go case, and re-check after the next data refresh.
Description
The objective of this Phase I effort is to design and demonstrate the feasibility of an integrated survey platform and decision-support framework—Project Celestial—to identify, evaluate, and rank optimal global locations for future terrestrial and maritime spaceports. The framework should model and evaluate multi-variable site-selection criteria—including geospatial, political, environmental, security, and logistical factors—to enable objective, data-driven analysis of candidate launch locations. The resulting capability should support strategic military and dual-use infrastructure planning for future terrestrial and maritime spaceport operations.
Score this topic against your capability statement
Loading teaming suggestions…
Post a teaming need for this topic. Team+ posts go live immediately; free/Pro posts are moderated.
Pro+: starter abstract / approach / work plan / risks — outline only, not a full proposal.
Pro+: paste solicitation text or upload PDF/DOCX to extract SHALL/must requirements.
Turn this topic into a compliance checklist, evaluation criteria, and win themes.