Ground-Based Affordable Mass (G-BAM)

SBIR topic from DIU, solicitation 26.BX. Closes 2026-12-23 (105 days left).

Component (WERX)
DIU
Agency
ARMY
Program / Phase
SBIR
Solicitation #
26.BX
Topic #
ARM26BX04-DV010
Status
Pre-release
TPOC Q&A window
Open until 2026-12-03 — sponsors accept direct questions during pre-release.
Pre-release date
2026-07-01
Open date
2026-12-03
Close date
2026-12-23 · 105 days until close · Add to calendar · See all deadlines
Set-aside
NAICS
Pre-release topic brief

Topic brief

This SBIR topic is in pre-release. Use the TPOC Q&A window before proposals open — that is the highest-value intelligence window on ARM26BX04-DV010.

Pre-release focus: Prioritize TPOC Q&A before the open date. Proposals open 2026-12-03.

Who this is for

  • Firms that already have a draft capability narrative ready to adapt
  • Teams that can ask sharp technical questions without revealing proprietary IP
  • Companies tracking a monthly DSIP / WERX release cadence

Capture playbook

  1. Read the full topic text and note must-have vs nice-to-have requirements
  2. Submit clarifying questions to the topic author / TPOC before Q&A closes
  3. Map prior winners in the same component and tech domain (see related awards)
  4. Run a free readiness scorecard and decide go / no-go before open day
  5. Set a deadline alert for 2026-12-23 so you do not miss close

pWin cues

  • Clear alignment between past performance and stated technical objectives
  • Ability to field a prototype on the implied timeline
  • No hard requirement you cannot evidence (facility, clearance, TRL)

Watch-outs

  • Q&A ends when the topic opens — late questions often go unanswered
  • Incumbents from prior topic families may already be drafting
  • Pre-release text can still change; re-read on open day

Topic brief FAQ

What is pre-release on SBIR/STTR topics?

Pre-release is the window after a topic is announced but before proposals open, when you may contact the topic author/TPOC with questions.

Should I start writing before the topic opens?

Outline and evidence mapping yes; final page-limited drafts wait until the official open text freezes requirements.

How do I track this deadline?

Save the topic on SBIR Signal and set a deadline alert, or use the deadline calendar export.

Readiness scorecard Capability match Monthly open-topic digest All topic briefs

Go / No-Go decision pack

One-click pack: competitive field, conversion signal, related awards, and (Pro) a full GO / MAYBE / NO-GO verdict against your capability.

Open scorecard Match my capability

Pro unlocks full Go/No-Go verdicts and named incumbents. Compare plans

Incumbent detector

No adjacent award history found for this topic yet. Use the decision pack and scorecard to build your own go/no-go case, and re-check after the next data refresh.

Description

The United States currently faces an "unprecedented" military buildup by China and increasing air and missile threats that demand a robust deterrent. However, the current inventory of long-range strike weapons is dominated by high-cost, low-volume systems or aging strategic assets like the Minuteman III, which dates back to the 1960s. The lack of a cost-effective, ground-launched payload delivery system prevents the Joint Force from achieving producibility at scale, leaving the U.S. vulnerable in high-intensity, multi-domain environments where high-end munitions would be rapidly depleted. The objective of this topic is to facilitate innovative research on low-cost, rapidly manufacturable, payload delivery systems.

View / apply on DoD DSIP ↗

Score this topic against your capability statement

Loading teaming suggestions…