Smart Manufacturing
SBIR topic from OSD, solicitation 26.BZ. Closes 2026-10-21 (42 days left).
- Component (WERX)
- OSD
- Agency
- OSD
- Program / Phase
- SBIR
- Solicitation #
- 26.BZ
- Topic #
- OSW26BZ06-DV032
- Status
- Pre-release
- TPOC Q&A window
- Open until 2026-09-23 — sponsors accept direct questions during pre-release.
- Pre-release date
- 2026-09-02
- Open date
- 2026-09-23
- Close date
- 2026-10-21 · 42 days until close · Add to calendar · See all deadlines
- Set-aside
- —
- NAICS
- —
Topic brief
This SBIR topic is in pre-release. Use the TPOC Q&A window before proposals open — that is the highest-value intelligence window on OSW26BZ06-DV032.
Who this is for
- Firms that already have a draft capability narrative ready to adapt
- Teams that can ask sharp technical questions without revealing proprietary IP
- Companies tracking a monthly DSIP / WERX release cadence
Capture playbook
- Read the full topic text and note must-have vs nice-to-have requirements
- Submit clarifying questions to the topic author / TPOC before Q&A closes
- Map prior winners in the same component and tech domain (see related awards)
- Run a free readiness scorecard and decide go / no-go before open day
- Set a deadline alert for 2026-10-21 so you do not miss close
pWin cues
- Clear alignment between past performance and stated technical objectives
- Ability to field a prototype on the implied timeline
- No hard requirement you cannot evidence (facility, clearance, TRL)
Watch-outs
- Q&A ends when the topic opens — late questions often go unanswered
- Incumbents from prior topic families may already be drafting
- Pre-release text can still change; re-read on open day
Peer open topics
Topic brief FAQ
What is pre-release on SBIR/STTR topics?
Pre-release is the window after a topic is announced but before proposals open, when you may contact the topic author/TPOC with questions.
Should I start writing before the topic opens?
Outline and evidence mapping yes; final page-limited drafts wait until the official open text freezes requirements.
How do I track this deadline?
Save the topic on SBIR Signal and set a deadline alert, or use the deadline calendar export.
Readiness scorecard Capability match Monthly open-topic digest All topic briefs
Go / No-Go decision pack
One-click pack: competitive field, conversion signal, related awards, and (Pro) a full GO / MAYBE / NO-GO verdict against your capability.
Open scorecard Match my capability
Pro unlocks full Go/No-Go verdicts and named incumbents. Compare plans
Incumbent detector
No adjacent award history found for this topic yet. Use the decision pack and scorecard to build your own go/no-go case, and re-check after the next data refresh.
Description
The objective of this Phase II effort is to design, validate, and demonstrate a fully open-source, private 5G network platform for smart manufacturing that integrates OCUDU, SD-Core, SD-RAN, and OSC components into a secure, vendor-neutral architecture. This platform will deliver highly reliable, low-latency connectivity to support autonomous robotics, machine vision, and connected-worker safety, providing a cost-effective, FutureG-ready solution for both commercial manufacturers and dual-use defense logistics facilities.
Score this topic against your capability statement
Loading teaming suggestions…
Post a teaming need for this topic. Team+ posts go live immediately; free/Pro posts are moderated.
Pro+: starter abstract / approach / work plan / risks — outline only, not a full proposal.
Pro+: paste solicitation text or upload PDF/DOCX to extract SHALL/must requirements.
Turn this topic into a compliance checklist, evaluation criteria, and win themes.