Rapidly Reconfigurable Pod-Based System Survivability Suite for Air Operations in Contested Environments
SBIR topic from AFWERX, solicitation 27.BZ. Pre-release. Closes 2027-01-06 (45 days left).
- Component (WERX)
- AFWERX
- Agency
- USAF
- Program / Phase
- SBIR
- Phases offered
- Direct to Phase II · Phase II · SPII
- Solicitation #
- 27.BZ
- Topic #
- DAF27BZ02-DV021
- Status
- Pre-release
- TPOC Q&A window
- Open until 2026-12-02 — sponsors accept direct questions during pre-release.
- Pre-release date
- 2026-11-04
- Open date
- 2026-12-02
- Close date
- 2027-01-06 · 45 days until close · Add to calendar · See all deadlines
- Set-aside
- —
- NAICS
- —
Topic brief
This SBIR topic is in pre-release. Use the TPOC Q&A window before proposals open — that is the highest-value intelligence window on DAF27BZ02-DV021.
Who this is for
- Firms that already have a draft capability narrative ready to adapt
- Teams that can ask sharp technical questions without revealing proprietary IP
- Companies tracking a monthly DSIP / WERX release cadence
Capture playbook
- Read the full topic text and note must-have vs nice-to-have requirements
- Submit clarifying questions to the topic author / TPOC before Q&A closes
- Map prior winners in the same component and tech domain (see related awards)
- Run a free readiness scorecard and decide go / no-go before open day
- Set a deadline alert for 2027-01-06 so you do not miss close
pWin cues
- Clear alignment between past performance and stated technical objectives
- Ability to field a prototype on the implied timeline
- No hard requirement you cannot evidence (facility, clearance, TRL)
Watch-outs
- Q&A ends when the topic opens — late questions often go unanswered
- Incumbents from prior topic families may already be drafting
- Pre-release text can still change; re-read on open day
Peer open topics
Topic brief FAQ
What is pre-release on SBIR/STTR topics?
Pre-release is the window after a topic is announced but before proposals open, when you may contact the topic author/TPOC with questions.
Should I start writing before the topic opens?
Outline and evidence mapping yes; final page-limited drafts wait until the official open text freezes requirements.
How do I track this deadline?
Save the topic on SBIR Signal and set a deadline alert, or use the deadline calendar export.
Readiness scorecard Capability match Monthly open-topic digest All topic briefs
Past SBIR/STTR Winners in This Topic Area
Historical federal R&D awardees in adjacent agencies and technology domains — click any firm to inspect their award portfolio or match their capabilities.
-
While vehicle-based radiation detection systems exist, they are limited in that 1) these systems are very large, heavy, and...
-
Physical Sciences Inc. (PSI) and our subcontractor Lawrence Berkeley National Laboratory (LBNL) propose to develop a suite of...
+4 more past winners & teaming history in this topic area. Create a free account or enter your email below to unlock full incumbent history and topic alerts.
Go / No-Go decision pack
One-click pack: competitive field, conversion signal, related awards, and (Pro) a full GO / MAYBE / NO-GO verdict against your capability.
Open scorecard Free top-3 capability match
Pro unlocks full Go/No-Go verdicts and named incumbents. Compare plans
Incumbent detector
No adjacent award history found for this topic yet. Use the decision pack and scorecard to build your own go/no-go case, and re-check after the next data refresh.
Description
Investigate, design, prototype, and experimentally evaluate advanced open-architecture methodologies and reconfigurable subsystem integration concepts within an external modular pod construct (threshold baseline: Air Force Research Laboratory [AFRL] Agile Pod). The primary R&D objective is to explore novel approaches for abstracting platform-to-payload interdependencies, solving multi-physics obscuration and thermal/electromagnetic boundary problems, and demonstrating dynamic, autonomous self-protection threat-warning, correlation, and countermeasure techniques via distributed edge compute without requiring host-platform system recertification.
Score this topic against your capability statement
Loading teaming suggestions…
Post a teaming need for this topic. Enterprise posts go live immediately; free/Pro posts are moderated.
Pro+: starter abstract / approach / work plan / risks — outline only, not a full proposal.
Pro+: paste solicitation text or upload PDF/DOCX to extract SHALL/must requirements.
Turn this topic into a compliance checklist, evaluation criteria, and win themes.