Novel Instrumentation for X-ray and Neutron Facilities

SBIR topic from DOE, solicitation PPO-CWX-SB004. Open now. Closes 2026-12-16 (24 days left).

Component (WERX)
—
Agency
DOE
Program / Phase
SBIR
Solicitation #
PPO-CWX-SB004
Topic #
17
Status
Open
Pre-release date
2026-10-30
Open date
2026-10-30
Close date
2026-12-16 · 24 days until close · Add to calendar · See all deadlines
Set-aside
—
NAICS
—
Agency SBIR topic brief

Topic brief

Traditional agency SBIR topic from DOE. Win rates improve when you mirror the solicitation language, show adjacent past performance, and confirm you can meet the close date (2026-12-16).

Agency topic focus: Line-by-line requirements mapping and adjacent past performance win traditional SBIR/STTR topics. Browse DOE awards for context.

Who this is for

  • Firms with past performance in this agency or adjacent tech domain
  • Teams that can evidence requirements line-by-line
  • Companies ready to make a go/no-go within days, not weeks

Capture playbook

  1. Extract SHALL / must requirements (use SAM shred on the solicitation text)
  2. Map each requirement to proof points from past work
  3. Review related awards and named incumbents on this page
  4. Build a Go/No-Go pack and only write if the verdict is GO or MAYBE
  5. Track 17 on a pipeline board and set a deadline alert

pWin cues

  • Keyword and technical overlap with prior agency awards
  • Realistic cost and schedule vs median awards in this domain
  • No mandatory set-aside or clearance gap you cannot meet

Watch-outs

  • Bidding topics outside your evidenced domain to 'practice'
  • Ignoring Phase I→II conversion rates in this agency
  • Late start relative to close date

Related awards (competition context)

  • NEI CORPORATION
    SBIR · Phase I · $149,993 · 2016 · Department of Energy
  • GINER INC
    SBIR · Phase I · $149,971 · 2016 · Department of Energy

Peer open topics

Topic brief FAQ

How do I research competition on this topic?

Use related awards and competitive intel on this page, plus awardee profiles linked from those awards.

What is a Go/No-Go pack?

A one-click decision pack combining competitive field, conversion signals, related awards, and (Pro) a verdict against your capability.

Where do I find more open topics like this?

Use component and agency filters on /opportunities, or the monthly open-topic digest.

Readiness scorecard Capability match Monthly open-topic digest All topic briefs

Past SBIR/STTR Winners in This Topic Area

Historical federal R&D awardees in adjacent agencies and technology domains — click any firm to inspect their award portfolio or match their capabilities.

  • NEI CORPORATION SBIR · Phase I · 2016 · Department of Energy

    Statement of the problem or situation that is being addressed in your application Radioiodine is produced during...

  • GINER INC SBIR · Phase I · 2016 · Department of Energy

    Statement of the Problem or Situation that is Being Addressed: Improper disposal of mercury has resulted in contamination of...

+4 more past winners & teaming history in this topic area. Create a free account or enter your email below to unlock full incumbent history and topic alerts.

Go / No-Go decision pack

One-click pack: competitive field, conversion signal, related awards, and (Pro) a full GO / MAYBE / NO-GO verdict against your capability.

Open scorecard Free top-3 capability match

Pro unlocks full Go/No-Go verdicts and named incumbents. Compare plans

Incumbent detector & competitive field

Who already wins work like this, and how hard it is to advance — from 240+ prior awards on record.

240 Incumbents on this topic (17)
0 Repeat winners in this domain/agency
— Phase I → II conversion
— Median Phase I award

Incumbents (preview)

  • E•••••• — 16 awards
  • G•••••• — 9 awards
  • B•••••• — 8 awards
  • P•••••• — 7 awards
  • E•••••• — 6 awards

Unlock named incumbents and repeat winners with full awardee links — upgrade to Pro or to start.

Description

The Basic Energy Sciences (BES) program invites applications for development of technologies to support its X-ray and neutron scattering scientific user facilities and advance BES missions in designing and building next-generation facilities. As science-driven X-ray and Neutron beam performance requirements increase, new technologies in accelerators, optics, instrumentation, and detectors are needed to generate, shape, and use these beams.

Areas of Interest

Specific areas of interest include the following:

a. Permanent magnet-based accelerator elements: A promising future upgrade path for DOE BES light sources and accelerator facilities is a new “Complex Bend” (CB) lattice that requires combined-function permanent magnet quadrupoles (PMQs). These PMQs integrate both bending (dipole) and strong focusing (quadrupole) magnetic fields within a single magnet assembly. Their compact design saves longitudinal space, addressing a common constraint in low-emittance lattice design.

Goals and Metrics

• The magnetic field strength requirements for these combined-function magnets are 0.5 Tesla for the dipole component and 130 Tesla per meter (T/m) for the quadrupole component. Additionally, the magnetic field must maintain a low level of higher-order multipoles (harmonics), specified as 10 units (1000 ppm) within a 3 mm good field region. Meeting this requirement is particularly challenging given the small magnet aperture (16 mm diameter), which increases sensitivity to mechanical and magnetic material errors.

• Proposals are sought for the development of two types of combined-function permanent magnet quadrupoles (PMQs):

o A hybrid PMQ design that combines PM with soft iron pole materials.

o A Halbach-type PMQ that uses only PM and offers more compact design geometry than the hybrid design.

• Further research and development (R&D) are needed to address key challenges associated with both designs and to meet the following requirements:

o Magnetic field correction after assembly

o Tunability of the magnetic field (± 2 %)

o Precise alignment within 15 µm

o Enhanced radiation resistance of permanent magnet materials enabling a lifecycle exceeding 30 years

Source: DOE FY26 Phase I Topics Document (ConnectWerx) · Topic text last updated November 20, 2026

How to apply: DOE takes applications by pitch through the DOE SBIR/STTR Application Hub. Pitches are due 12/16 at 2 PM ET.

Official source: search topic 17 (solicitation PPO-CWX-SB004) on the agency's SBIR/STTR portal.

Check if your capability fits this topic

Loading teaming suggestions…