XL SCIENTIFIC LLC — Department of Defense SBIR Phase I: N212-101

XL SCIENTIFIC LLC — SBIR Phase I award from Department of Defense.

Phase I SBIR feasibility signal

  • Phase I awards fund proof-of-concept work. For capture teams, they mark early interest from Department of Defense in a technical approach.
  • Watch for Phase II follow-ons from the same firm/topic family — that conversion path is where budgets and transition pressure rise.
  • Obligated amount $139,828. Cross-check similar awards in the same agency and technology tags for going-rate context.
  • Topic code N212-101 links this award to a solicitation family — search the same topic stem for incumbents and recompete timing.

Informational capture context from public federal data — not legal or bid advice.

Amount
$139,828
Agency
Department of Defense · Navy
Program / Phase
SBIR · Phase I
Topic
N212-101
Solicitation
21.2
NAICS
Place of performance
NM
Period
2022-03-18 → 2023-01-18

Description

The DoD has identified a need for more non-lethal options for vehicle and vessel stopping.  High power microwave (HPM) weapons, including Non-Linear Transmission Line (NLTL) sources, provide a robust, non-lethal, counter-electronics option otherwise impossible for conventional munitions.  Existing technologies do not offer the range or form-factor required for practical operations in the field.  The Broadband Engine-stOppeR Nltl (BEORN) system offered here will improve and extend the ability of US War Fighters in this critical DoD capability need.  BEORN consists of an ultrawideband (UWB) NLTL source, driven by a solid-state pulsed power driver, and feeding an extremely compact UWB antenna (such as the Verus Research proprietary Ferengi).  As part of this SBIR effort Verus Research will team with Energetrix to assemble a prototype and provide an early demonstration of vehicle/vessel engine estopping in the initial phase and option.  This work will set a clear path to an evaluation of a longer-range, operationally robust, array-based system that is compact and affordable in the follow-up Phases.