NORWICH TECHNOLOGIES INC — Department of Energy SBIR Phase I: 12f

NORWICH TECHNOLOGIES INC — SBIR Phase I award from Department of Energy.

Amount
$196,155
Agency
Department of Energy
Program / Phase
SBIR · Phase I
Topic
12f
Solicitation
DE-FOA-0001941
NAICS
Place of performance
VT
Period
2019-07-01 → 2020-03-31

Description

In some areas of the USA and Europe, the installed capacity of renewable generation has reached a level at which wholesale energy prices can drop below zero due to overproduction relative to baseload capacity. The value of energy exported to the grid for behind-the-meter (BTM) systems is dropping, with policies in many states now promoting self-consumption of produced energy rather than net-metering. As a result, systems including energy storage are being increasingly valued. While storage is an intrinsic component of today’s concentrating solar power (CSP), traditional utility scale plants require billions of dollars in capital expense; take many years to site, permit, and construct; use vast tracts of open land; and have to compete against low-cost baseload power. Norwich Technologies (NT) will develop a distributed-scale CSP (D-CSP) system that integrates a novel low cost storage subsystem with proven solar field and power block technology. The system will operate at a maximum temperature of 350oC and be primarily targeted at BTM applications, using long term storage to enable high percentage rates of self-consumption for commercial and industrial (C&I), municipal, university, school, and hospital (MUSH) customers. By targeting higher value energy streams and higher storage ratios than traditional CSP, NT will enable widespread deployment of CSP, thus enhancing grid reliability, resiliency and security for customers across the sun belt. In contrast to traditional CSP, our system can be permitted, designed, and built in under 18 months; will have intermediate capital requirements (i.e., few $1M’s to $10M’s); have modest land requirements similar to commercial scale PV; and can target retail versus wholesale power rates because of BTM operation. During the Phase I program we will de-risk the storage system through design and computational modelling followed by a laboratory-scale test and demonstration. We will perform detailed cost analysis for the storage system and all components of the solar field and power block. By improving the fidelity of our solar power plant models we will determine the optimum solar field configurations for a variety of potential customers’ needs and environments. We will develop partnerships for a field-scale demonstration to be designed and deployed during the anticipated Phase II program.