LUNAR RESOURCES, INC. — National Aeronautics and Space Administration SBIR Phase I: Z4

LUNAR RESOURCES, INC. — SBIR Phase I award from National Aeronautics and Space Administration.

Phase I SBIR feasibility signal

  • Phase I awards fund proof-of-concept work. For capture teams, they mark early interest from National Aeronautics and Space Administration in a technical approach.
  • Watch for Phase II follow-ons from the same firm/topic family — that conversion path is where budgets and transition pressure rise.
  • Obligated amount $149,996. Cross-check similar awards in the same agency and technology tags for going-rate context.
  • Topic code Z4 links this award to a solicitation family — search the same topic stem for incumbents and recompete timing.

Informational capture context from public federal data — not legal or bid advice.

Amount
$149,996
Agency
National Aeronautics and Space Administration
Program / Phase
SBIR · Phase I
Topic
Z4
Solicitation
SBIR_23_P1
NAICS
Place of performance
TX
Period
2023-07-25 → 2024-02-02

Description

Lunar Resources proposes to NASArsquo;s SBIR program the In-Situ Casting of Standard Structural Elements on the Moon (ICSE) program to mature a process to cast standard lunar extracted ISRU metal structural elements on the Moon without earth-based consumables. The goal of the effort is to develop the capability of casting in-situ produced metals into truss elementsnbsp;to produce trusses with varying widths, lengths, and thicknesses. nbsp;The focus of the effort is to mature the equipment and production process to efficiently producenbsp;truss elements without any consumables from Earth. nbsp;Furthermore, the equipment and process will be matured for casting of other metals, such as iron, to produce other structural element geometries.