NWB SENSORS INC — Department of Agriculture SBIR Phase I: 8.4

NWB SENSORS INC — SBIR Phase I award from Department of Agriculture.

Phase I SBIR feasibility signal

  • Phase I awards fund proof-of-concept work. For capture teams, they mark early interest from Department of Agriculture in a technical approach.
  • Watch for Phase II follow-ons from the same firm/topic family — that conversion path is where budgets and transition pressure rise.
  • Obligated amount $153,622. Cross-check similar awards in the same agency and technology tags for going-rate context.
  • Topic code 8.4 links this award to a solicitation family — search the same topic stem for incumbents and recompete timing.

Informational capture context from public federal data — not legal or bid advice.

Amount
$153,622
Agency
Department of Agriculture
Program / Phase
SBIR · Phase I
Topic
8.4
Solicitation
USDA-NIFA-SBIR-009301
NAICS
Place of performance
MT
Period
2023-03-31 → 2024-02-29

Description

Project SummaryAccumulated snowpack is a major source of water throughout the United States. Accuratelymonitoring snow on the northern plains is a significant need for streamflow forecasting andreservoir management. This has been demonstrated by the US Army Corp of Engineersestablishment of the Upper Missouri River Basin Plains Snow and Soil Moisture MonitoringNetwork. The availability of a low-cost snow water equivalent (SWE) measurement systemwould allow large areas of the northern plains to be adequately sampled in a cost effective way.To address the need for a low-cost SWE measurement system we propose a novel method ofmeasuring snow using a single Global Navigation Satellite System (GNSS) receiver system.During Phase I the method will be applied to GNSS data previously collected. The key objectiveof the Phase I research is to determine whether the proposed method results in SWEmeasurements that are sufficiently accurate to compete with existing technologies. Comparisonswill be made between SWE retrieved using the proposed method and existing technologies.Based on results design recommendations for an operational system will be made with the goalof building and testing this system under Phase II.