AIR-LOCK, INCORPORATED — National Aeronautics and Space Administration SBIR Phase I: The current NASA spacesuit community is focusing on utilizing a 13" hemispherical helmet f

AIR-LOCK, INCORPORATED — SBIR Phase I award from National Aeronautics and Space Administration.

Phase I SBIR feasibility signal

  • Phase I awards fund proof-of-concept work. For capture teams, they mark early interest from National Aeronautics and Space Administration in a technical approach.
  • Watch for Phase II follow-ons from the same firm/topic family — that conversion path is where budgets and transition pressure rise.
  • Obligated amount $117,809. Cross-check similar awards in the same agency and technology tags for going-rate context.

Informational capture context from public federal data — not legal or bid advice.

Amount
$117,809
Agency
National Aeronautics and Space Administration
Program / Phase
SBIR · Phase I
NAICS
—
Place of performance
CT
Period
2013-05-23 → 2013-11-23

Description

The current NASA spacesuit community is focusing on utilizing a 13" hemispherical helmet for the next generation of extravehicular activity spacesuits. This helmet architecture presents the end user with a myriad of positive attributes, including a large field of view, enhanced CO2 washout and improved component durability/operational life. The 13" Dome Helmet architecture has proven these attributes via the NASA MK-III and Z-1 advanced EVA spacesuit test beds. Air-Lock's 2012 SBIR proposal advances the 13" Dome Helmet from NASA prototype/test bed to EVA Acceptability for Use by enhancing the design with a fully functional Extravehicular Visor Assembly (EVVA).Phase I will see Air-Lock engineers leverage current Helmet/EVVA technologies, infuse the design with lessons learned from the EMU Program and implement the resultant design into a 13" hemispherical helmet architecture; heretofore referred to as the Advanced Extravehicular Helmet Assembly (AEHA). In addition to the design facet of the Phase I task, Air-Lock engineers will develop a Verification and Validation Test Plan (V & V) based on current EMU S/AD and CARD requirements along with higher Advanced EVA operating pressures (8.0 psi). This test plan will lay the foundation for Phase 2 Acceptability for Use testing to facilitate the use of the AEHA aboard the International Space Station in support of NASA's planned 2017 ISS Advanced Spacesuit Demonstration Test.