E BEAM INC — National Aeronautics and Space Administration SBIR Phase I: We propose a reservoir cathode to improve performance in both ion and Hall-effect thruster

E BEAM INC — SBIR Phase I award from National Aeronautics and Space Administration.

Phase I SBIR feasibility signal

  • Phase I awards fund proof-of-concept work. For capture teams, they mark early interest from National Aeronautics and Space Administration in a technical approach.
  • Watch for Phase II follow-ons from the same firm/topic family — that conversion path is where budgets and transition pressure rise.
  • Obligated amount $99,958. Cross-check similar awards in the same agency and technology tags for going-rate context.

Informational capture context from public federal data — not legal or bid advice.

Amount
$99,958
Agency
National Aeronautics and Space Administration
Program / Phase
SBIR · Phase I
NAICS
Place of performance
OR
Period
2011-02-18 → 2011-09-29

Description

We propose a reservoir cathode to improve performance in both ion and Hall-effect thrusters. We propose to adapt our existing reservoir cathode technology to this purpose. Reservoir cathodes are the only emission sources that are capable of providing the necessary current density (>5.0 A/cm2) and life (>100,000 hours) for next generation high-power thrusters. More powerful thrusters are needed for interplanetary and lunar missions, including earth escape and near-earth space maneuvers. Reservoir cathodes are able to provide sufficient new barium to the cathode surface to overcome the high barium removal rates in ion engines. We have many years' experience developing reservoir cathodes. The key challenge is the stresses exerted on the cathode tube due to differential expansion and large temperature excursions. These lead to fracturing and weld failure. Our innovation solves this problem. In Phase I, a prototype is built and tested. In Phase II, we optimize for specific ion engines.