ADVANCED SYSTEMS SUPPORTABILITY ENGINEERING TECHNOLOGIES AND TOOLS, INC — Department of Defense SBIR Phase III: PLATFORM INTEGRATED CONTROL SYSTEM (PICS) & CRITICAL BATTERY MANAGEMENT SYSTEM (CBMS) SMAL
ADVANCED SYSTEMS SUPPORTABILITY ENGINEERING TECHNOLOGIES AND TOOLS, INC — SBIR Phase III award from Department of Defense.
Phase III transition / production-path signal
- Phase III work is typically non-SBIR set-aside follow-on. Seeing ADVANCED SYSTEMS SUPPORTABILITY ENGINEERING TECHNOLOGIES AND TOOLS, INC at Phase III is a strong transition indicator in this domain.
- Competitors studying dual-use scale-up should treat Phase III firms as graduation benchmarks, not just Phase I/II volume leaders.
- At $11,410,360, this is a large obligation for typical SBIR Phase sizing — worth reviewing for scope breadth and teaming opportunity.
- Tagged technology areas: C4ISR, Power & Energy. Follow those hubs for open topics and peer winners in the same cluster.
Summary
The U.S. Special Operations Command awarded over $11 million for development of a Platform Integrated Control System and Critical Battery Management System. This SBIR Phase III project integrates platform controls and manages critical batteries for specialized military equipment.
- Amount
- $11,410,360
- Agency
- Department of Defense · U.S. Special Operations Command
- Program / Phase
- SBIR · Phase III
- NAICS
- 541512 · COMPUTER SYSTEMS DESIGN SERVICES
- Place of performance
- VA
- Period
- 2024-03-01 → 2028-04-03
Technology domains
Description
PLATFORM INTEGRATED CONTROL SYSTEM (PICS) & CRITICAL BATTERY MANAGEMENT SYSTEM (CBMS) SMALL BUSINESS INNOVATION & RESEARCH (SBIR) PHASE III