BOSTON ENGINEERING CORPORATION — Department of Defense SBIR Phase I: N221-040

BOSTON ENGINEERING CORPORATION — SBIR Phase I award from Department of Defense.

Phase I SBIR feasibility signal

  • Phase I awards fund proof-of-concept work. For capture teams, they mark early interest from Department of Defense in a technical approach.
  • Watch for Phase II follow-ons from the same firm/topic family — that conversion path is where budgets and transition pressure rise.
  • Obligated amount $239,988. Cross-check similar awards in the same agency and technology tags for going-rate context.
  • Topic code N221-040 links this award to a solicitation family — search the same topic stem for incumbents and recompete timing.

Informational capture context from public federal data — not legal or bid advice.

Amount
$239,988
Agency
Department of Defense · Navy
Program / Phase
SBIR · Phase I
Topic
N221-040
Solicitation
22.1
NAICS
—
Place of performance
MA
Period
2022-07-26 → 2024-01-16

Description

Boston Engineering established a business relation with ADDiTEC, an innovator and maker of an open materials platform using wire Laser Metal Deposition (LMD) technology; a form of Direct Energy Deposition (DED) employed for metal additive manufacturing (MAM). Our qualified team of engineers and subject matter experts will advance ADDiTEC technology to meet operational requirements on board expeditionary vessels, such as shock and vibration. Development efforts include development, options analysis, concept design and solution transition planning. Starting with a proven MAM technology lowers risk for establishing high value metal printing capability and should reduce the transition time to commercialization the benefits for our warfighters. Development activities include assessment and concept design for part additive manufacturing (AM) in conjunction with subtractive manufacturing (SM), e.g., Haas CNC, which provides a more advanced and complete part manufacturing solution. Phase I enables final technical assessments and gap analysis needed to set Phase II final design, build and testing of a MAM system at a lab equipped to verify resilience to simulated operational conditions expected. Initial part build quality monitoring will be executed during Phase I efforts, but Phase I Option will be used to advance detailed options and planning for establishing desired capability.