FIBERTEK, INC. — Department of Defense SBIR Phase I: HQ085021S0001-01

FIBERTEK, INC. — SBIR Phase I award from Department of Defense.

Phase I SBIR feasibility signal

  • Phase I awards fund proof-of-concept work. For capture teams, they mark early interest from Department of Defense in a technical approach.
  • Watch for Phase II follow-ons from the same firm/topic family — that conversion path is where budgets and transition pressure rise.
  • Obligated amount $259,571. Cross-check similar awards in the same agency and technology tags for going-rate context.
  • Topic code HQ085021S0001-01 links this award to a solicitation family — search the same topic stem for incumbents and recompete timing.

Informational capture context from public federal data — not legal or bid advice.

Amount
$259,571
Agency
Department of Defense
Program / Phase
SBIR · Phase I
Topic
HQ085021S0001-01
Solicitation
HQ085021S0001.5
NAICS
Place of performance
VA
Period
2022-09-23 → 2023-09-22

Description

Fibertek proposes to develop and mature systems requires for an ultra-low latency, all optical relay around an in-plane constellation of LEO satellites.  The effort addresses the optical terminal, optical add/drop multiplexer and high gain / low noise figure Erbium Doped Fiber Amplifier (EDFA).  The primary focus of the proposed is the EDFA as it is the least mature and highest risk sub-system required for the realization of an optical relay.  The Phase I program will finalize performance requirements and demonstrate feasibility of the reliable, low cost in volume, and manufacturable EDFA sub-system, setting the stage for a successful Phase II program in which the EDFA will be matured to TRL-6.  In addition, the Phase II program will develop an optical relay system design including Fibertek’s TRL-6 optical head, coarse pointing mechanism for in-plane links and an optical add/drop multiplexer.  A manufacturing transition plan will be started in Phase I and completed in the Phase II supporting a rapid transition to SDA relevant quantities and target costs.